Full weekend closure of M3 between J2 & J3 from Friday 18th November 2016
The M3 Motorway between Junction 2 & 3 will be closed from 9pm on Friday 18th November 2016 and will re-open on Monday 21st November 2016 at 5.30am.
Woodlands Lane Bridge, which stretches across the M3 motorway between junctions 2 and 3
near Windlesham village, has signicantly deteriorated since the bridge was rst constructed leading to the bridge having a weight and width restriction imposed upon it. As a result the bridge requires complete demolition and a full reconstruction.
To find out more about this project and detailed information about the closures Highways England have produced this newsletter which can be downloaded - Highways England News Letter - Woodlands Road Bridge Demolition








November 4, 2016
This closure is subject to safety reviews and is weather dependant and in the event it is cancelled there are two consecutive contingency weekend dates in place for 25-28 November and 2-5 December 2016.
November 5, 2016
will junc 3 be open for exit from the direction of junc 4 and 4a between 18 and 21 Nov?
November 6, 2016
If you download the document in the article all details are there. Here it is http://surreyresidents.co.uk/wp-content/uploads/2016/11/Woodlands-Bridge-Demolition-newsletter.pdf
November 6, 2016
Will jnt 2 open to get on to the M25…??
November 7, 2016
The situation with the M3 over the past 2 years has been absolutely ridiculous. Who ever granted the permission to have road works over 16 miles should be sacked.
Educated idiots should be ashamed of themselves
November 13, 2016
Do the organisers of this closure realise that there is an England rugby match at twice ham on sat 19 th nov!Just to add to the traffic that will probably be on the A30.